Cost to Build a New Virtualized Data Center, Part 2a

In part one of Cost to Build a New Virtualized Data Center, we discussed the basic software costs for a virtualized data center based on VMware vSphere 6.0, Citrix XenServer 6.5, Microsoft Hyper-V 2012 R2 and 2016, and Red Hat. If you missed that, please click here to review before continuing.

This post will take that original premise and expand it to include storage with a view to moving the entire environment toward a software-defined data center.

Once again, our compute unit of choice is the Dell 730xd with two 10-core CPUs and 256 GB of RAM. Now, we need to add some local storage in each node. This compute node can, depending on the choices made during the configuration, take up to twenty-four disk drives. For the purposes of this article, we assume that data locality is required for performance, and that there is a need for an all-flash array. We have chosen to go with two 400 GB SLC drives for cache and four 800 MLC drives for capacity. This means that there is a total raw capacity per node of 4 TB. There may be a requirement for further hardware, depending on the chosen solutions for each hypervisor, but that will be called out in the relevant vendor section. Due to the length of this article, we have split it into two sections. This post deals with the costs surrounding vSphere and Hyper-V.

read more

Advertisements
%d bloggers like this: